Canton, Ohio

Screen Shot 2021-08-10 at 1.49.37 PM.png

OPERATION CENTER

STARK LIBRARY

The new Stark Library Operations Center replaces a former maintenance garage, creating a purpose-built facility to support the library system’s essential behind-the-scenes functions. This facility centralizes mobile services, technical services, and central inventory departments, along with a mail room for deliveries to all branch locations.
The Operations Center features a drive-through garage that can accommodate nine vehicles, including large bookmobile buses and smaller fleet vehicles, reflecting Stark Library’s updated mobile service strategy. The building is designed exclusively for staff, with no public functions, and includes key spaces like workrooms, conference rooms, breakrooms, unisex restrooms, and a wellness room. A larger elevator and strategically placed storage rooms optimize the movement and processing of materials.
The second floor houses central inventory and additional staff amenities, including a breakroom that opens onto a rooftop patio. Reflecting a cohesive campus vision, the design coordinates with the new Main Library’s materials and aesthetics, while the site plan takes advantage of shared green space, visually and physically connecting the Operations Center to the new Main Library. This project not only enhances operational efficiency but also aligns with Stark Library’s long-term service goals.

SERVICES

HBM | Design Architect, Interior Designer, and Architect of Record

SIZE

24,809 SF